Home » Microsoft OMC Building Water Storage Case Study

Microsoft OMC Building Water Storage Upgrade

As part of an expansion at the Microsoft OMC Building in Dublin, Tricel was selected to increase the site’s water-storage capacity for an office environment with more than 700 workstations. The project involved dismantling the existing tank and installing three new sectional GRP water tanks within a compressed programme.

Published
Sector
High Rise / Commercial
Reading Time

Approx. 6 Minutes

Client

Microsoft OMC Building, via site contractor

Location

Leopardstown, Dublin

Tricel’s role

Tank supplier and installer

Solution

Three sectional GRP water tanks

Installation

20–23 April 2026

Status

Completed & fully operational

01

The Project

Expanding Water Storage for a Growing Commercial Facility

The Microsoft OMC Building is a large-scale commercial office development designed to support more than 700 workstations. As part of the site’s expansion, the building’s water-storage infrastructure had to be upgraded to meet increasing demand and keep supply reliable across the facility.

The existing tank was no longer sufficient for the expanded facility. The upgrade needed to increase storage capacity so that a high-occupancy office environment could continue to operate without interruption.

Tricel Water was appointed through the site contractor as tank supplier and installer. The work covered dismantling the existing system, installing three new sectional GRP water tanks and reconfiguring the arrangement to increase overall storage capacity, all within a compressed programme.

Microsoft OMC Building image, case study

02

The Challenge

High Demand, Tight Programme

Capacity Limitations

The existing tank could not meet the expanded facility’s requirements, so the new arrangement had to increase overall storage capacity.

Time Pressure

The client required the installation to be completed ahead of the original schedule.

Scheduling Complexity

The installation had to be brought forward while Tricel’s installation crews were already fully booked.

Strict Site Protocols

The installation had to be brought forward while Tricel’s installation crews were already fully booked.

03

The Solution

Three New Sectional GRP Water Tanks

Tricel’s delivery approach addressed both the technical and the logistical challenges of the project. The work was carried out in three stages:

01

Dismantle

The existing tank was safely dismantled before installation began.

02

Install

Three new sectional GRP tanks were installed to increase overall capacity.

03

Reconfigure

The storage arrangement was reconfigured to increase water-storage capacity.

Scope of work

To meet the client’s urgent requirements, the installation schedule was brought forward by approximately two weeks. Close coordination between Tricel’s office team and installation crew kept disruption to a minimum, and the dismantling and installation were completed over four days, from 20 to 23 April 2026.

About Tricel Sectional GRP Tanks

General product information from Tricel’s sectional tank range. It does not describe the specification of the tanks installed on this project.

Project Gallery

Rooftop GRP sectional water tank with access ladder and safety cage.

04

The Results

Delivered in Four Days

3

New sectional GRP tanks

4 days

Installation completed

~2 weeks

Programme brought forward

700+

Workstations in the office environment

Increased Capacity

The upgraded system now supports high-demand office use, with three sectional GRP tanks in place of the previous tank.

On-Programme Delivery

Dismantling and installation were completed within a tight four-day window, after the programme had been brought forward by about two weeks.

Minimal Disruption

The new tanks were integrated into the existing infrastructure through close coordination between the office team and installation crew.

Client Satisfaction

Positive feedback was received immediately after completion, including a written testimonial on the site team’s work.

Client Testimonial

Ross and Adam were a credit to the company throughout this project.

Representative, Microsoft OMC Project, Dublin

“Ross and Adam were a credit to the company throughout this project. Over four days in Leopardstown, they efficiently dismantled the existing tank and installed three new tanks to an exceptional standard. Their professionalism, positive attitude, and willingness to go above and beyond made a real difference. In an industry where skilled personnel are hard to find, they truly stand out.”

05

Project Outcome

A Water-Storage Upgrade Delivered on Schedule

Despite the compressed timeline and site constraints, the installation was completed over four days with no issues reported on site. The Microsoft OMC Building now has increased water-storage capacity to support its high-occupancy office environment, and the system is fully operational.

The project shows how Tricel combines flexible scheduling, technical knowledge and close coordination between office and site teams to deliver an infrastructure upgrade for a major commercial facility under strict conditions and tight deadlines.

For more on how Tricel sectional tanks are delivered and assembled, see sectional tank installation.

Need a Commercial Water Storage Solution?

Whether you are upgrading an existing system or planning new water-storage infrastructure, Tricel can help assess your project requirements and identify an appropriate solution.

More Sectional Tank Projects

Related Case Studies

Tricel has supplied and installed sectional water tanks for hospitals, colleges and hotels across Ireland, including replacements carried out around live operations and tight programmes.

Exterior of Cork University Hospital, site of a Tricel insulated GRP sectional water tank installation.

Tricel Water Ireland

Insulated Sectional Water Tank Installation – Cork University Hospital

Healthcare

Cork

Tricel supplied and installed two insulated GRP sectional water tanks at Cork University Hospital, replacing existing cold water storage tanks while maintaining water supply during the works.

Historic University of Galway campus building, where Tricel supplied GRP sectional cold water storage tanks.

Tricel Water Ireland

Sectional Tank Installation - University of Galway

Educational

Galway

Tricel supplied and installed multiple GRP sectional water storage tanks for the University of Galway, providing additional cold water storage capacity to support the continued expansion of the campus.

Tricel Water Ireland

Sectional Tank Installation – Monart Hotel, Wexford

Hospitality

Wexford

Tricel dismantled the existing tank at Monart Hotel in County Wexford and installed a replacement sectional cold water storage tank, with insulated covers, on the same plinth.